{"id":244,"date":"2016-11-01T12:00:10","date_gmt":"2016-11-01T19:00:10","guid":{"rendered":"http:\/\/www.jahelkarealestategroup.com\/blog\/?p=244"},"modified":"2016-12-10T13:03:15","modified_gmt":"2016-12-10T21:03:15","slug":"construction-update-suspended-slab-poured-on-building-b","status":"publish","type":"post","link":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/","title":{"rendered":"Construction Update: Suspended Slab Poured on Building B"},"content":{"rendered":"<p>The structurally reinforced suspended slab main level floors were poured yesterday (October 31), marking a major milestone for the Westmark team as construction continues on Phase 3 of Pacific Station, North Nanaimo&#8217;s premier office location. Building B features 8 units ranging between 1,876 and 2,209 sqft, with flexible unit configuration possible to accommodate business needs of up to approx 16,00o sqft.<\/p>\n<p>For those interested in some of the construction details for Building B, here is a brief summary:<\/p>\n<p><strong>Foundations:<\/strong> Steel reinforced poured concrete footings, column footing, and perimeter bearing walls.<\/p>\n<p><strong>Floor Structure:\u00a0<\/strong>Grade level to be reinforced, poured concrete slab. Main level are cast-in-place, structurally reinforced suspended slab. Second storey floors are concrete topping over plywood sub-floors over wood joists, insulated to cavity, with fire rated gypsum board to the underside.<\/p>\n<p><strong>Ceilings:<\/strong> Open roof truss system; sprinkler system and HVAC duct work exposed<\/p>\n<p><strong>Interior Construction:<\/strong> Demising walls and interior structural walls within the buildings are painted gypsum board cover over wood stud frame; insulated to cavity.<\/p>\n<p>For more information, contact Commercial Real Estate Advisor Devin Jahelka at 250-751-0804 or info@jahelkagroup.com<\/p>\n<p>www.pacificstationoffices.com<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The structurally reinforced suspended slab main level floors were poured yesterday (October 31), marking a major milestone for the Westmark team as construction continues on Phase 3 of Pacific Station, &hellip; [<a href=\"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/\">read more<\/a>]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-244","post","type-post","status-publish","format-standard","hentry","category-pacific-station","has-post-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group\" \/>\n<meta property=\"og:description\" content=\"The structurally reinforced suspended slab main level floors were poured yesterday (October 31), marking a major milestone for the Westmark team as construction continues on Phase 3 of Pacific Station, &hellip; [read more]\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/\" \/>\n<meta property=\"og:site_name\" content=\"Jahelka Real Estate Group\" \/>\n<meta property=\"article:published_time\" content=\"2016-11-01T19:00:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-12-10T21:03:15+00:00\" \/>\n<meta name=\"author\" content=\"Devin Jahelka\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Devin Jahelka\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/\"},\"author\":{\"name\":\"Devin Jahelka\",\"@id\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/1697afc2ff70c01fc4bdf952aabd7840\"},\"headline\":\"Construction Update: Suspended Slab Poured on Building B\",\"datePublished\":\"2016-11-01T19:00:10+00:00\",\"dateModified\":\"2016-12-10T21:03:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/\"},\"wordCount\":193,\"commentCount\":0,\"articleSection\":[\"Pacific Station\"],\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/\",\"url\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/\",\"name\":\"Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/#website\"},\"datePublished\":\"2016-11-01T19:00:10+00:00\",\"dateModified\":\"2016-12-10T21:03:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/1697afc2ff70c01fc4bdf952aabd7840\"},\"breadcrumb\":{\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/construction-update-suspended-slab-poured-on-building-b\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Update: Suspended Slab Poured on Building B\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/\",\"name\":\"Jahelka Real Estate Group\",\"description\":\"The Jahelka Group&#039;s Market Updates\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/1697afc2ff70c01fc4bdf952aabd7840\",\"name\":\"Devin Jahelka\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g\",\"caption\":\"Devin Jahelka\"},\"url\":\"http:\\\/\\\/www.jahelkarealestategroup.com\\\/blog\\\/author\\\/devin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/","og_locale":"en_US","og_type":"article","og_title":"Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group","og_description":"The structurally reinforced suspended slab main level floors were poured yesterday (October 31), marking a major milestone for the Westmark team as construction continues on Phase 3 of Pacific Station, &hellip; [read more]","og_url":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/","og_site_name":"Jahelka Real Estate Group","article_published_time":"2016-11-01T19:00:10+00:00","article_modified_time":"2016-12-10T21:03:15+00:00","author":"Devin Jahelka","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Devin Jahelka","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/#article","isPartOf":{"@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/"},"author":{"name":"Devin Jahelka","@id":"https:\/\/www.jahelkarealestategroup.com\/blog\/#\/schema\/person\/1697afc2ff70c01fc4bdf952aabd7840"},"headline":"Construction Update: Suspended Slab Poured on Building B","datePublished":"2016-11-01T19:00:10+00:00","dateModified":"2016-12-10T21:03:15+00:00","mainEntityOfPage":{"@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/"},"wordCount":193,"commentCount":0,"articleSection":["Pacific Station"],"inLanguage":"en-CA","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/#respond"]}]},{"@type":"WebPage","@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/","url":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/","name":"Construction Update: Suspended Slab Poured on Building B - Jahelka Real Estate Group","isPartOf":{"@id":"https:\/\/www.jahelkarealestategroup.com\/blog\/#website"},"datePublished":"2016-11-01T19:00:10+00:00","dateModified":"2016-12-10T21:03:15+00:00","author":{"@id":"https:\/\/www.jahelkarealestategroup.com\/blog\/#\/schema\/person\/1697afc2ff70c01fc4bdf952aabd7840"},"breadcrumb":{"@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/"]}]},{"@type":"BreadcrumbList","@id":"http:\/\/www.jahelkarealestategroup.com\/blog\/construction-update-suspended-slab-poured-on-building-b\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.jahelkarealestategroup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Construction Update: Suspended Slab Poured on Building B"}]},{"@type":"WebSite","@id":"https:\/\/www.jahelkarealestategroup.com\/blog\/#website","url":"https:\/\/www.jahelkarealestategroup.com\/blog\/","name":"Jahelka Real Estate Group","description":"The Jahelka Group&#039;s Market Updates","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.jahelkarealestategroup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Person","@id":"https:\/\/www.jahelkarealestategroup.com\/blog\/#\/schema\/person\/1697afc2ff70c01fc4bdf952aabd7840","name":"Devin Jahelka","image":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/secure.gravatar.com\/avatar\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d60dfa1dfacbf7c43650e7e6a92ebdac0c1e63ed418a691ffbe9db380fc9eb19?s=96&d=mm&r=g","caption":"Devin Jahelka"},"url":"http:\/\/www.jahelkarealestategroup.com\/blog\/author\/devin\/"}]}},"_links":{"self":[{"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/posts\/244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/comments?post=244"}],"version-history":[{"count":3,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/posts\/244\/revisions"}],"predecessor-version":[{"id":248,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/posts\/244\/revisions\/248"}],"wp:attachment":[{"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/media?parent=244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/categories?post=244"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.jahelkarealestategroup.com\/blog\/wp-json\/wp\/v2\/tags?post=244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}